
Fixing a leak in the drainage of a laboratory.
In the atrium of Erasmus MC in Rotterdam, above the ceiling system, at a height of about 35 metres.
Making a custom trussframe and fixing a leak in a laboratory drain.
Our technicians made the leak accessible by hoisting a custom-made truss frame to just below the ceiling, using rope techniques. We are proud to have fixed this job within 2 days, so that the laboratory could be opened again for patients.
Sign up for our updates.