Replacing a conductor guide.
On an offshore installation in Dutch waters.
Witch a team of 3 rop access technicians we removed and lifted the old conductor guide. With this hoisting installation the new conductor was placed in the right position from maindeck. Using rope techniques and lifting tools, our team successfully completed this assignment in 3 working days.
By using rope access, the lead time was considerably reduced and there was a minimal load on the installation.
Sign up for our updates.