Replacing a conductor guide

Back to overview

WHAT

Replacing a conductor guide.

Period
April 2017

Client
N-Sea

WHERE

On an offshore installation in Dutch waters.

 

WORK ACTIVITIES

Witch a team of 3 rop access technicians we removed and lifted the old conductor guide. With this hoisting installation the new conductor was placed in the right position from maindeck. Using rope techniques and lifting tools, our team successfully completed this assignment in 3 working days.

 

WHY ROPE ACCESS?

By using rope access, the lead time was considerably reduced and there was a minimal load on the installation.