Carrying out inspection and maintenance work on an entirely steel roof construction.
Swimming pool ‘de Wisselaar’ and swimming pool ‘Sonsbeeck’ in Breda.
Visual inspection and reporting of the steel roof construction of two swimming pools. In addition to this work, the team of Bilfinger Height Specialists also immediately preserved the rust spots found.
With a team of 1 IRATA level 3 supervisor and 2 technicians we successfully completed the work at both swimming pools.
With rope access we made it possible to significantly reduce runtime and exposure to hazards in comparison to other methods of working at height. Rope access was therefore the best, safest and quickest solution here.
Sign up for our updates.