Bridge maintenance 16 July 2019

Back to overview

De Oversteek bridge in Nijmegen was in need of maintenance. As the work was also above water, it was decided to use rope access. That is why Bilfinger Height Specialists worked with Bam Infra last week.  We had to load the balustrade as little as possible and could therefore not use it as an anchor point, so we had to use an alternative. We chose to work with an ISC A-frame. This frame is fully certified as an anchor point and is approved within rope access. Under the supervision of a level 3 supervisor and based on IRATA guidelines, our team carried out the maintenance work.
We would like to thank BAM Infra for this great assignment!

Read more about our work above water here!